Solar PV System

Solar photovoltaic (PV) systems convert solar energy into electricity for use by the building. The system components work together to optimize electricity generation from the sun, providing renewable electricity for both the building they are connected to and the grid.

Effective useful life

25 years

Eligibility requirements

  • All systems are grid-connected and compliant with the latest version of the Government of Alberta's Micro-generation Regulation (AR27/2008) and amendments.
  • All PV modules and components must be Canadian Standards Association (CSA) or UL certified for use in Canada. All components must be new and not previously used in an energized solar PV system.
  • Projects sized greater than 150 kW AC or classified as a "large micro-generation" by the most recently published Alberta Micro-Generation Regulation require operating procedures at the time of installation. For purposes of sizing, the rated output capacity is defined as the combined storage and solar PV system output.
  • Warranty periods, from the time of installation, must be at minimum: Modules — 25-year power performance and 10-year manufacturing warranties; Inverter(s) and any related PV module optimizers — 10-year manufacturing warranty.
  • Must have a warranty provided by the Qualified Contractor for defects in materials and labour for a period of not less than one year.

Documents required at application

Step 3 of the CEIP journey – Project Application

What you provide

  • A contractor quote
  • Equipment specification sheet(s), for all equipment in the system, confirming equipment details.

What your contractor must provide

A quote itemizing:

  • Address of property where the upgrade is being installed
  • Equipment to be installed
  • Make and model number(s)
  • Proposed system size (kW DC)
  • Proposed annual generation (kWh AC)
  • Costs of equipment, system design and development, and installation
  • Deposit amount (if required)

Documents required at completion

Step 6 of the CEIP journey – Upgrade Completion

What you provide

  • A contractor invoice
  • A copy of the Interconnection and Operating Agreement signed between the micro-generation owner and the wire service provider.
  • A copy of the single line diagram.
  • If the system is greater than 150 kW AC in size (or classified as a "large micro-generation"): a copy of the system's operating procedures.
  • Photos of the fully installed solar PV array, with all modules visible.
  • A photo of the inverter(s) installed on the property.
  • A photo of the inverter nameplate label (including model and serial number), with all information legible.
  • A photo of the module nameplate label (including model and serial number), with all information legible.

What your contractor must provide

An invoice itemizing:

  • Address of property where the upgrade was installed
  • Installed equipment
  • Make and model number(s)
  • Installed system size (kW DC)
  • Installation date
  • Costs of equipment, system design and development, and installation