Residential Property

Residential Upgrades

Doors, Windows & Insulation

Attic Insulation

Attic insulation reduces heat loss through the attic area of the building envelope. This reduces the load on the heating and/or cooling system.

This upgrade can also improve airtightness.

Effective useful life

20 years

Eligibility requirements

  • Final insulation, including existing and added insulation, must be equal to or greater than R-28.
  • Must cover a minimum of 20 per cent of the total attic area.
  • Must have a manufacturer's warranty for a period consistent with the industry standard and not less than one year.
  • Must have a warranty provided by the Qualified Contractor for defects in materials and labour for a period of not less than one year.

Documents required at application

Step 3 of the CEIP journey – Project Application

What you provide

  • A contractor quote
  • Material specification sheet(s) confirming product details.

What your contractor must provide

A quote itemizing:

  • Address of property where the upgrade is being installed
  • Insulation brand and type to be installed
  • Method of installation
  • Amount (square feet) of the existing and new insulation
  • R-value of the existing and new insulation
  • Costs of material and installation
  • Deposit amount (if required)

Documents required at completion

Step 6 of the CEIP journey – Upgrade Completion

What you provide

  • A contractor invoice
  • Photos of installed insulation, with R-value marking and thickness measurement clearly visible, before being sealed behind sheeting.

What your contractor must provide

An invoice itemizing:

  • Address of property where the upgrade was installed
  • Insulation brand and type installed
  • Method of installation
  • Amount (square feet) of the new insulation
  • R-value added
  • Installation date
  • Costs of material and installation