SCHEDULED SYSTEM MAINTENANCE

Residential Property

Residential Upgrades

Heating, Ventilation & Air Conditioning

High-Efficiency Gas Boiler

A high-efficiency boiler extracts the maximum amount of heat from natural gas by using condensing technology. This means heat from condensing water in the exhaust is extracted, in addition to regular combustion.

Boiler pipe insulation ensures minimal heat is lost before heated water is delivered to conditioned spaces. Pipe insulation is an eligible cost that can be combined with this upgrade to increase energy savings.

Thermostats are an eligible cost that can be included as part of this upgrade.

Effective useful life

25 years

Eligibility requirements

  • Must be ENERGY STAR certified to the most recently published version.
  • Must include outdoor reset control.
  • Must have an AFUE (annual fuel utilization efficiency) equal to or greater than 95%.
  • Must be fueled by natural gas or propane gas.
  • Must replace existing, less-efficient primary space heating equipment.
  • Must have a manufacturer's warranty for a period consistent with the industry standard and not less than one year.
  • Must have a warranty provided by the Qualified Contractor for defects in materials and labour for a period of not less than one year.

Documents required at application

Step 3 of the CEIP journey – Project Application

What you provide

  • A contractor quote
  • Equipment specification sheet(s) confirming equipment details and ENERGY STAR certification.

What your contractor must provide

A quote itemizing:

  • Address of property where the upgrade is being installed
  • Equipment to be installed
  • Efficiency specifications
  • Equipment make and model number(s)
  • Size in BTU/hour
  • Costs of equipment and installation
  • Deposit amount (if required)

If pipe insulation is being financed, the quote must also include:

  • Insulation type
  • Location in home of pipe being insulated
  • Amount (linear metres or feet)
  • Per cent of the total area covered
  • Costs of material and installation

Documents required at completion

Step 6 of the CEIP journey – Upgrade Completion

What you provide

  • A contractor invoice
  • A photo of the equipment installed on the property.
  • A photo of the equipment nameplate label (including model and serial number), with all information legible.

What your contractor must provide

An invoice itemizing:

  • Address of property where the upgrade was installed
  • Installed equipment
  • Equipment make and model number(s)
  • Size in BTU/hour
  • Installation date
  • Costs of equipment and installation

If pipe insulation is being financed, the invoice must also include:

  • Insulation type
  • Location in home of pipe being insulated
  • Amount (linear metres or feet)
  • Per cent of total area covered
  • Costs of material and installation