Battery energy storage systems enable the storage of solar electricity generated on the property, to be used at a later point in time.

Effective useful life

10 years

Eligibility requirements

  • All components must be CSA certified for use in Canada.
  • Warranty period(s) must be a minimum of 10 years, guaranteeing 60% or more of installed storage capacity during the period.
  • Must be a new lithium-ion battery.
  • Must have a warranty provided by the Qualified Contractor for defects in materials and labour for a period of not less than one year.

Documents required at application

Step 3 of the CEIP journey – Project Application

What you provide

  • A contractor quote
  • Specification sheet(s) confirming equipment details.

What your contractor must provide

A quote itemizing:

  • Address of property where the upgrade is being installed
  • Cost of equipment to be installed
  • Equipment make and model number(s)
  • Size/capacity in Amp hours (Ah)
  • Costs of equipment, system design and development, and installation
  • Deposit amount (if required)

Documents required at completion

Step 6 of the CEIP journey – Upgrade Completion

What you provide

  • A contractor invoice
  • A copy of the Interconnection and Operating Agreement signed between micro-generation owner and the wire service provider for the solar PV system connected to the battery energy storage.
  • A single line diagram for the project, demonstrating how the battery energy storage is integrated with the solar PV system.
  • A photo of the equipment installed on the property.
  • A photo of the equipment nameplate label (including model and serial number) with all information legible.

What your contractor must provide

An invoice itemizing:

  • Address of property where the upgrade was installed
  • Installed equipment
  • Equipment make and model number(s)
  • Size/capacity in Amp hours (Ah)
  • Installation date
  • Costs of equipment and installation