SCHEDULED SYSTEM MAINTENANCE

Residential Property

Residential Upgrades

Jasper Rebuild Upgrades

Jasper Rebuild Upgrades

This pathway is designed for upgrades to residential properties being rebuilt after the 2024 Jasper wildfire. Jasper rebuild upgrades will be eligible for financing if they meet the eligibility requirements listed below and, additionally, are approved by Alberta Municipalities and the Municipality of Jasper.

Important notes:

  • Anyone interested in pursuing the Jasper rebuild upgrades pathway should contact Alberta Municipalities prior to contracting an engineering consultant or Energy Advisor and submitting a Project Application Form.
  • Projects requesting financing for solar PV upgrades only are not required to submit a letter from a professional engineer or Energy Advisor. Solar PV only projects follow the existing requirements for solar PV upgrades (see DER-001).

Project completion timelines:

  • From pre-qualification approval, participants have 3 months to submit a full application including contractor quotes and letter from an engineer or Energy Advisor.
  • Once program agreements are signed (typically ~2 months after full application submission), projects have 6 months to complete installation.
  • It is recommended to submit the pre-qualification form approximately 10 months before expected installation.

Eligibility requirements

  • A Professional Engineer with experience related to the design and installation of the type of upgrade(s), or a registered NRCan Energy Advisor, must confirm that the upgrade will increase energy efficiency or the use of renewable energy on the property. The baseline is the minimum Alberta Building Code requirement for new construction.
  • The upgrade must have a manufacturer's warranty for a period consistent with the industry standard and not less than one year.
  • The upgrade must have a warranty provided by the Qualified Contractor for defects in materials and labour for a period of not less than one year.
  • Any other requirements as defined by Alberta Municipalities at the time of application.

Documents required at application

Step 3 of the CEIP journey – Project Application

What you provide

  • A letter stamped by a Professional Engineer, or signed by a registered NRCan Energy Advisor
  • A contractor quote
  • Equipment/material specification sheet(s) confirming product details.

What your contractor must provide

A letter stamped by a Professional Engineer, or signed by a registered NRCan Energy Advisor, confirming:

  • The minimum building code requirement for the proposed upgrade
  • That installing the proposed upgrade will result in energy savings and/or the increased use of renewable energy on the property, compared to the minimum building code requirement, and that the Engineer or Energy Advisor has completed calculations to verify this
  • The effective useful life of the upgrade (in years)
  • The estimated annual and lifetime energy and greenhouse gas emissions savings to be achieved by the upgrade, compared to the minimum building code requirement

A quote itemizing:

  • Address of property where the upgrade is being installed
  • Make and model of the upgrade equipment/material to be installed
  • Size of the equipment/material to be installed
  • Location of the upgrade installation
  • Cost of equipment/material and installation (must be clearly separated from other costs)
  • Deposit amount (if required)

Documents required at completion

Step 6 of the CEIP journey – Upgrade Completion

What you provide

  • A contractor invoice
  • A photo of equipment/material installed on the property.
  • A photo of the equipment nameplate label (including model and serial number), with all information legible.

What your contractor must provide

An invoice itemizing:

  • Address of property where the upgrade was installed
  • Make and model of the upgrade equipment/material installed
  • Size of the equipment/material installed
  • Location of the upgrade installation
  • Cost of equipment/material and installation (must be clearly separated from other costs)