Residential Property

Residential Upgrades

Heating, Ventilation & Air Conditioning

Heat and Energy Recovery Ventilation (HRV/ERV)

Heat and energy recovery equipment extracts heat and/or energy from stale air exhausted to the outside of the home. The recovered energy is used to reduce the heating of fresh air delivered to the home.

Duct insulation ensures minimal heat is lost before conditioned air is delivered to conditioned spaces. Duct insulation is an eligible cost that can be combined with this upgrade to increase energy savings.

Effective useful life

18 years

Notes

If replacing an existing system, 18 years.

If the unit is a required design element in projects that improve air tightness and is installed with a CEIP financed upgrade that improves air tightness, the Effective Useful Life (EUL) is based on the air sealing upgrade (e.g., windows, doors, and insulation) that the heat and energy recovery ventilation system is combined with.

Eligibility requirements

Must either:

  • Replace a less efficient heat or energy recovery ventilation system, OR
  • Be required due to the air tightness of the home being improved through the installation of a CEIP financed air sealing upgrade(s).

If replacing an existing system:

  • The efficiency of the new unit must be higher than the existing unit.

If not replacing an existing system:

  • The unit must be identified by the Qualified Contractor or Energy Advisor as required due to improved air tightness of the home.
  • The unit must be installed with a financed upgrade that improves air tightness (e.g., doors, windows, and insulation).
  • The pre-project EnerGuide Home Evaluation must include air sealing as a recommended upgrade.

Additional requirements:

  • Must be a factory-assembled, packaged unit including fans or blowers that transfer heat between two isolated airstreams.
  • Must be ENERGY STAR certified to the most recently published version and Home Ventilating Institute (HVI) certified (must appear in section III of the HVI Certified Products Directory).
  • Must not be a portable unit.
  • Must have a manufacturer's warranty for a period consistent with the industry standard and not less than one year.
  • Must have a warranty provided by the Qualified Contractor for defects in materials and labour for a period of not less than one year.

Documents required at application

Step 3 of the CEIP journey – Project Application

What you provide

  • A contractor quote
  • Equipment specification sheet(s) confirming equipment details, and ENERGY STAR and HVI certification.

What your contractor must provide

A quote itemizing:

  • Address of property where the upgrade is being installed
  • Equipment to be installed
  • Efficiency specifications
  • Equipment make and model number(s)
  • Capacity in cubic feet per minute (cfm)
  • Costs of equipment and installation
  • Deposit amount (if required)

If duct insulation is being financed, the quote must also include:

  • Insulation type
  • Location in home of ducting being installed
  • Amount (linear metres or feet)
  • Per cent of total area covered
  • Costs of material and installation

Documents required at completion

Step 6 of the CEIP journey – Upgrade Completion

What you provide

  • A contractor invoice
  • A photo of the equipment installed on the property.
  • A photo of the equipment nameplate label (including model and serial number), with all information legible.
  • If combined with an upgrade that improves air tightness, in addition to what is listed here, refer to ‘Supporting Documentation for the Upgrade Completion Form’ for that upgrade’s required documentation.

What your contractor must provide

An invoice itemizing:

  • Address of property where the upgrade was installed
  • The installed equipment
  • Equipment make and model number(s)
  • Capacity in cubic feet per minute (cfm)
  • Installation date
  • Costs of equipment and installation

If duct insulation is being financed, the invoice must also include:

  • Insulation type
  • Location in home of ducting being insulated
  • Amount (linear metres or feet)
  • Per cent of total area covered
  • Costs of material and installation