Residential Property
Heating, Ventilation & Air Conditioning
High-Efficiency Gas Boiler
A high-efficiency boiler extracts the maximum amount of heat from natural gas by using condensing technology. This means heat from condensing water in the exhaust is extracted, in addition to regular combustion.
Boiler pipe insulation ensures minimal heat is lost before heated water is delivered to conditioned spaces. Pipe insulation is an eligible cost that can be combined with this upgrade to increase energy savings.
Thermostats are an eligible cost that can be included as part of this upgrade.
Program overview
Financing terms are set by each municipality and can change. Visit the City of Airdrie's website (opens in a new tab) to learn more about their program.
- Status
- Paused
- Interest rate
- 2.75%
- Maximum repayment term
- 25 years
- Maximum deposit available from CEIP
- 50%
Financing terms are set by each municipality and can change. Visit the City of Beaumont's website (opens in a new tab) to learn more about their program.
- Status
- Waitlisting
- Interest rate
- 3.5%
- Maximum repayment term
- 20 years
- Maximum deposit available from CEIP
- 30%
Financing terms are set by each municipality and can change. Visit the City of Calgary's website (opens in a new tab) to learn more about their program.
- Status
- Next intake: Jan. 26, 2027
- Interest rate
- Estimated 6.00–6.10%
- Maximum repayment term
- 20 years
- Maximum deposit available from CEIP
- 30%
Financing terms are set by each municipality and can change. Visit the City of Cold Lake's website (opens in a new tab) to learn more about their program.
- Status
- Waitlisting
- Interest rate
- 3.1%
- Maximum repayment term
- 20 years
- Maximum deposit available from CEIP
- 30%
Financing terms are set by each municipality and can change. Visit the City of Edmonton's website (opens in a new tab) to learn more about their program.
- Status
- Waitlisting
- Interest rate
- 6.0%
- Maximum repayment term
- 20 years
- Maximum deposit available from CEIP
- 10%
Financing terms are set by each municipality and can change. Visit the City of Grande Prairie's website (opens in a new tab) to learn more about their program.
- Status
- Paused
- Interest rate
- 3.0%
- Maximum repayment term
- 20 years
- Maximum deposit available from CEIP
- 25%
Financing terms are set by each municipality and can change. Visit the City of Leduc's website (opens in a new tab) to learn more about their program.
- Status
- Closed
- Interest rate
- *
- Maximum repayment term
- 20 years
- Maximum deposit available from CEIP
- 30%
Financing terms are set by each municipality and can change. Visit the City of Lethbridge's website (opens in a new tab) to learn more about their program.
- Status
- Paused
- Interest rate
- 2.83%
- Maximum repayment term
- 20 years
- Maximum deposit available from CEIP
- None
Financing terms are set by each municipality and can change. Visit the City of Medicine Hat's website (opens in a new tab) to learn more about their program.
- Status
- Open
- Interest rate
- 3.25%
- Maximum repayment term
- 20 years
- Maximum deposit available from CEIP
- 30%
Financing terms are set by each municipality and can change. Visit the City of Spruce Grove's website (opens in a new tab) to learn more about their program.
- Status
- Paused
- Interest rate
- 3.5%
- Maximum repayment term
- 20 years
- Maximum deposit available from CEIP
- 30%
Financing terms are set by each municipality and can change. Visit the City of St. Albert's website (opens in a new tab) to learn more about their program.
- Status
- Closed
- Interest rate
- 3.0%
- Maximum repayment term
- 20 years
- Maximum deposit available from CEIP
- 30%
Financing terms are set by each municipality and can change. Visit the City of Wetaskiwin's website (opens in a new tab) to learn more about their program.
- Status
- Open
- Interest rate
- 3.2%
- Maximum repayment term
- 20 years
- Maximum deposit available from CEIP
- 30%
Financing terms are set by each municipality and can change. Visit Lac La Biche County's website (opens in a new tab) to learn more about their program.
- Status
- Paused
- Interest rate
- 0.0%
- Maximum repayment term
- 20 years
- Maximum deposit available from CEIP
- 30%
Financing terms are set by each municipality and can change. Visit the Municipality of Jasper's website (opens in a new tab) to learn more about their program.
- Status
- Waitlisting
- Interest rate
- 3.0%
- Maximum repayment term
- 25 years
- Maximum deposit available from CEIP
- 50%
Financing terms are set by each municipality and can change. Visit Pincher Creek Region's website (opens in a new tab) to learn more about their program.
- Status
- Waitlisting
- Interest rate
- 2.0%
- Maximum repayment term
- 20 years
- Maximum deposit available from CEIP
- 30%
Financing terms are set by each municipality and can change. Visit Strathcona County's website (opens in a new tab) to learn more about their program.
- Status
- Paused
- Interest rate
- 2.0%
- Maximum repayment term
- 20 years
- Maximum deposit available from CEIP
- 30%
Financing terms are set by each municipality and can change. Visit Sturgeon County's website (opens in a new tab) to learn more about their program.
- Status
- Waitlisting
- Interest rate
- 3.0%
- Maximum repayment term
- 20 years
- Maximum deposit available from CEIP
- 30%
Financing terms are set by each municipality and can change. Visit the Town of Banff's website (opens in a new tab) to learn more about their program.
- Status
- Open
- Interest rate
- 3.0%
- Maximum repayment term
- 20 years
- Maximum deposit available from CEIP
- 50%
Financing terms are set by each municipality and can change. Visit the Town of Canmore's website (opens in a new tab) to learn more about their program.
- Status
- Paused
- Interest rate
- 2.7%
- Maximum repayment term
- 20 years
- Maximum deposit available from CEIP
- 50%
Financing terms are set by each municipality and can change. Visit the Town of Devon's website (opens in a new tab) to learn more about their program.
- Status
- Closed
- Interest rate
- 4.0%
- Maximum repayment term
- 20 years
- Maximum deposit available from CEIP
- 15%
Financing terms are set by each municipality and can change. Visit the Town of Drayton Valley's website (opens in a new tab) to learn more about their program.
- Status
- Open
- Interest rate
- 4.16%
- Maximum repayment term
- 20 years
- Maximum deposit available from CEIP
- 30%
Financing terms are set by each municipality and can change. Visit the Town of Okotoks's website (opens in a new tab) to learn more about their program.
- Status
- Waitlisting
- Interest rate
- 3.0%
- Maximum repayment term
- 20 years
- Maximum deposit available from CEIP
- 30%
Financing terms are set by each municipality and can change. Visit the Town of Rocky Mountain House's website (opens in a new tab) to learn more about their program.
- Status
- Closed
- Interest rate
- 3.5%
- Maximum repayment term
- 20 years
- Maximum deposit available from CEIP
- 50%
Financing terms are set by each municipality and can change. Visit the Town of Stettler's website (opens in a new tab) to learn more about their program.
- Status
- Open
- Interest rate
- 5.6%
- Maximum repayment term
- 25 years
- Maximum deposit available from CEIP
- None
Financing terms are set by each municipality and can change. Visit the Town of Taber's website (opens in a new tab) to learn more about their program.
- Status
- Open
- Interest rate
- 2.0%
- Maximum repayment term
- 20 years
- Maximum deposit available from CEIP
- 30%
Financing terms are set by each municipality and can change. Visit the Town of Westlock's website (opens in a new tab) to learn more about their program.
- Status
- Open
- Interest rate
- 3.0%
- Maximum repayment term
- 20 years
- Maximum deposit available from CEIP
- 30%
Financing terms are set by each municipality and can change. Visit the Village of Stirling's website (opens in a new tab) to learn more about their program.
- Status
- Open
- Interest rate
- *
- Maximum repayment term
- 20 years
- Maximum deposit available from CEIP
- None
Not available in
This upgrade is not offered in your municipality. See the upgrades that are available.
Effective useful life
25 years
Note: Although this upgrade has an effective useful life of 25 years, the City of Beaumont has a maximum repayment term of 20 years.
Note: Although this upgrade has an effective useful life of 25 years, the City of Calgary has a maximum repayment term of 20 years.
Note: Although this upgrade has an effective useful life of 25 years, the City of Cold Lake has a maximum repayment term of 20 years.
Note: Although this upgrade has an effective useful life of 25 years, the City of Edmonton has a maximum repayment term of 20 years.
Note: Although this upgrade has an effective useful life of 25 years, the City of Grande Prairie has a maximum repayment term of 20 years.
Note: Although this upgrade has an effective useful life of 25 years, the City of Leduc has a maximum repayment term of 20 years.
Note: Although this upgrade has an effective useful life of 25 years, the City of Lethbridge has a maximum repayment term of 20 years.
Note: Although this upgrade has an effective useful life of 25 years, the City of Medicine Hat has a maximum repayment term of 20 years.
Note: Although this upgrade has an effective useful life of 25 years, the City of Spruce Grove has a maximum repayment term of 20 years.
Note: Although this upgrade has an effective useful life of 25 years, the City of St. Albert has a maximum repayment term of 20 years.
Note: Although this upgrade has an effective useful life of 25 years, the City of Wetaskiwin has a maximum repayment term of 20 years.
Note: Although this upgrade has an effective useful life of 25 years, Lac La Biche County has a maximum repayment term of 20 years.
Note: Although this upgrade has an effective useful life of 25 years, Pincher Creek Region has a maximum repayment term of 20 years.
Note: Although this upgrade has an effective useful life of 25 years, Strathcona County has a maximum repayment term of 20 years.
Note: Although this upgrade has an effective useful life of 25 years, Sturgeon County has a maximum repayment term of 20 years.
Note: Although this upgrade has an effective useful life of 25 years, the Town of Banff has a maximum repayment term of 20 years.
Note: Although this upgrade has an effective useful life of 25 years, the Town of Canmore has a maximum repayment term of 20 years.
Note: Although this upgrade has an effective useful life of 25 years, the Town of Devon has a maximum repayment term of 20 years.
Note: Although this upgrade has an effective useful life of 25 years, the Town of Drayton Valley has a maximum repayment term of 20 years.
Note: Although this upgrade has an effective useful life of 25 years, the Town of Okotoks has a maximum repayment term of 20 years.
Note: Although this upgrade has an effective useful life of 25 years, the Town of Rocky Mountain House has a maximum repayment term of 20 years.
Note: Although this upgrade has an effective useful life of 25 years, the Town of Taber has a maximum repayment term of 20 years.
Note: Although this upgrade has an effective useful life of 25 years, the Town of Westlock has a maximum repayment term of 20 years.
Note: Although this upgrade has an effective useful life of 25 years, the Village of Stirling has a maximum repayment term of 20 years.
Eligibility requirements
- Must be ENERGY STAR certified to the most recently published version.
- Must include outdoor reset control.
- Must have an AFUE (annual fuel utilization efficiency) equal to or greater than 95%.
- Must be fueled by natural gas or propane gas.
- Must replace existing, less-efficient primary space heating equipment.
- Must have a manufacturer's warranty for a period consistent with the industry standard and not less than one year.
- Must have a warranty provided by the Qualified Contractor for defects in materials and labour for a period of not less than one year.
Documents required at application
Step 3 of the CEIP journey – Project Application
What you provide
- A contractor quote
- Equipment specification sheet(s) confirming equipment details and ENERGY STAR certification.
What your contractor must provide
A quote itemizing:
- Address of property where the upgrade is being installed
- Equipment to be installed
- Efficiency specifications
- Equipment make and model number(s)
- Size in BTU/hour
- Costs of equipment and installation
- Deposit amount (if required)
If pipe insulation is being financed, the quote must also include:
- Insulation type
- Location in home of pipe being insulated
- Amount (linear metres or feet)
- Per cent of the total area covered
- Costs of material and installation
Documents required at completion
Step 6 of the CEIP journey – Upgrade Completion
What you provide
- A contractor invoice
- A photo of the equipment installed on the property.
- A photo of the equipment nameplate label (including model and serial number), with all information legible.
What your contractor must provide
An invoice itemizing:
- Address of property where the upgrade was installed
- Installed equipment
- Equipment make and model number(s)
- Size in BTU/hour
- Installation date
- Costs of equipment and installation
If pipe insulation is being financed, the invoice must also include:
- Insulation type
- Location in home of pipe being insulated
- Amount (linear metres or feet)
- Per cent of total area covered
- Costs of material and installation